Timeline
Aug 28, 2016:
- 6:05 PM Ticket #484 (Remove LAM and LAM dependencies) closed by
- closed: Closed this, since we no longer support/ship LAM in v3.3.4.
- 5:17 PM Ticket #975 (test ticket) created by
- 3:45 PM Ticket #588 (Add a param_space test to the BCCD test suite) closed by
- closed: Its done in BCCD_MPI_Module_Test.sh
- 3:31 PM Ticket #836 (mpich2 hangs in liberation) closed by
- closed: Closed the ticket. Since nobody have reported issues with MPIC2 in 3.3.3.
Aug 23, 2016:
- 11:06 PM Changeset in /cluster/svnroot [5758] by
- add target directory re #915
- 11:03 PM Changeset in /cluster/svnroot [5757] by
- use PATH re #915
- 10:58 PM Changeset in /cluster/svnroot [5756] by
- test deb target re #915
Aug 11, 2016:
- 11:53 PM Changeset in /cluster/svnroot [5755] by
- interim commit re #915
Aug 8, 2016:
- 10:42 PM Changeset in /cluster/svnroot [5754] by
- final commit re #915
- 8:43 PM Changeset in /cluster/svnroot [5753] by
- interim commit, through line 1507 in build_livecd.pl re #915
- 8:26 PM Changeset in /cluster/svnroot [5752] by
- no longer need trees/home re #915
Aug 4, 2016:
- 9:08 PM Changeset in /cluster/svnroot [5751] by
- interim commit, through line 1340 in build_livecd.pl re #915
Note: See TracTimeline
for information about the timeline view.