Timeline


and

Aug 28, 2016:

6:05 PM Ticket #484 (Remove LAM and LAM dependencies) closed by mmludin08
closed: Closed this, since we no longer support/ship LAM in v3.3.4.
5:17 PM Ticket #975 (test ticket) created by skylar
3:45 PM Ticket #588 (Add a param_space test to the BCCD test suite) closed by mmludin08
closed: Its done in BCCD_MPI_Module_Test.sh
3:31 PM Ticket #836 (mpich2 hangs in liberation) closed by mmludin08
closed: Closed the ticket. Since nobody have reported issues with MPIC2 in 3.3.3.

Aug 23, 2016:

11:06 PM Changeset in /cluster/svnroot [5758] by skylar
add target directory re #915
11:03 PM Changeset in /cluster/svnroot [5757] by skylar
use PATH re #915
10:58 PM Changeset in /cluster/svnroot [5756] by skylar
test deb target re #915

Aug 11, 2016:

11:53 PM Changeset in /cluster/svnroot [5755] by skylar
interim commit re #915

Aug 8, 2016:

10:42 PM Changeset in /cluster/svnroot [5754] by skylar
final commit re #915
8:43 PM Changeset in /cluster/svnroot [5753] by skylar
interim commit, through line 1507 in build_livecd.pl re #915
8:26 PM Changeset in /cluster/svnroot [5752] by skylar
no longer need trees/home re #915

Aug 4, 2016:

9:08 PM Changeset in /cluster/svnroot [5751] by skylar
interim commit, through line 1340 in build_livecd.pl re #915
Note: See TracTimeline for information about the timeline view.