Timeline


and

08/28/16:

18:05 Ticket #484 (Remove LAM and LAM dependencies) closed by mmludin08
closed: Closed this, since we no longer support/ship LAM in v3.3.4.
17:17 Ticket #975 (test ticket) created by skylar
15:45 Ticket #588 (Add a param_space test to the BCCD test suite) closed by mmludin08
closed: Its done in BCCD_MPI_Module_Test.sh
15:31 Ticket #836 (mpich2 hangs in liberation) closed by mmludin08
closed: Closed the ticket. Since nobody have reported issues with MPIC2 in 3.3.3.

08/23/16:

23:06 Changeset in /cluster/svnroot [5758] by skylar
add target directory re #915
23:03 Changeset in /cluster/svnroot [5757] by skylar
use PATH re #915
22:58 Changeset in /cluster/svnroot [5756] by skylar
test deb target re #915

08/11/16:

23:53 Changeset in /cluster/svnroot [5755] by skylar
interim commit re #915

08/08/16:

22:42 Changeset in /cluster/svnroot [5754] by skylar
final commit re #915
20:43 Changeset in /cluster/svnroot [5753] by skylar
interim commit, through line 1507 in build_livecd.pl re #915
20:26 Changeset in /cluster/svnroot [5752] by skylar
no longer need trees/home re #915

08/04/16:

21:08 Changeset in /cluster/svnroot [5751] by skylar
interim commit, through line 1340 in build_livecd.pl re #915
Note: See TracTimeline for information about the timeline view.