Mobeen-log

From Earlham Cluster Department

(Difference between revisions)
Jump to: navigation, search
(. July 1/2011 - July 3/2011: on Campus)
 
(43 intermediate revisions not shown)
Line 1: Line 1:
''' * Day, activity, time '''
''' * Day, activity, time '''
-
== May 12/2011 - May 29/2011 ==
+
--------------------------------------------------------------------------------
 +
==. May 12/2011 - May 29/2011 ==
''' Monday May 16/2011: Mainboard + Memory Testing - Time Spent: 6 Hours '''
''' Monday May 16/2011: Mainboard + Memory Testing - Time Spent: 6 Hours '''
-
<font size="$param0">Quantity: 40</font >
+
<font size="$param0">
 +
* Quantity: 40
-
<font size="$param0">Tests Results: Positive</font >
+
* Tests Results: Positive
-
<font size="$param1">Problem/Issues: None</font >
+
* Problem/Issues: None
-
<font size="$param1">Time: 1:00Am - 6:00Pm</font >  
+
 
 +
* Time: 1:00Am - 6:00Pm
 +
</font >  
''' Tuesday May 17/2011: Mainboard + Memory Testing - Time Spent: 6 Hours '''
''' Tuesday May 17/2011: Mainboard + Memory Testing - Time Spent: 6 Hours '''
-
<font size="$param1">Quantity: 40
+
<font size="$param1">
-
                   
+
* Quantity: 40        
-
Tests Results: Positive
+
-
                    Problem/Issues: None
+
* Tests Results: Positive
-
                    Time: 1:00Am - 6:00Pm
+
* Problem/Issues: None
 +
* Time: 1:00Am - 6:00Pm
</font >  
</font >  
 +
''' Wednesday May 18/2011: Mainboard + Memory Testing + LittleFe - Time Spent: 6 Hours '''
''' Wednesday May 18/2011: Mainboard + Memory Testing + LittleFe - Time Spent: 6 Hours '''
-
                    '''Quantity: 8  
+
*                    Quantity: 8  
-
                    Tests Results: Positive
+
*                    Tests Results: Positive
-
                    LittleFe: I worked on LittleFe, and tested BCCD. Liberated BCCD onto the Hard Drive.
+
*                    LittleFe: I worked on LittleFe, and tested BCCD. Liberated BCCD onto the Hard Drive.
-
                    Problem/Issues: Had problems with PXE-Booting.  
+
*                    Problem/Issues: Had problems with PXE-Booting.  
-
                    Time: 1:00Am - 6:00Pm'''
+
*                    Time: 1:00Am - 6:00Pm
''' Thursday May 19/2011: LittleFe + BCCD Testing - Time Spent: 6 Hours '''
''' Thursday May 19/2011: LittleFe + BCCD Testing - Time Spent: 6 Hours '''
-
                    Quantity: 40
+
*                    Quantity: 40
-
                    Tests Results: Positive
+
*                    Tests Results: Positive
-
                    Problem/Issues: Fixed the PXE-Booting Problems by changing BIOS  
+
*                    Problem/Issues: Fixed the PXE-Booting Problems by changing BIOS  
-
                                    For PXE-Booting Onboard LAN BootRAM should be Enabled. To do so, following step will help
+
*                                    For PXE-Booting Onboard LAN BootRAM should be Enabled. To do so, following step will help
-
                                                  1-Restart Mainboard  
+
#                                                  -Restart Mainboard  
-
                                                  2-Press DEL - TO enter setup  
+
#                                                  -Press DEL - TO enter setup  
-
                                                  3-Go to Integrated Peripherals  
+
#                                                  -Go to Integrated Peripherals  
-
                                                  4-Go to Onboard Device Function  
+
#                                                  -Go to Onboard Device Function  
-
                                                  5-Change the LAN BootROM to Enabled
+
#                                                  -Change the LAN BootROM to Enabled
-
                                                  6-Press F10 to save and exit BIOS  
+
#                                                  -Press F10 to save and exit BIOS  
-
                                                  7-Repeat the process for each Mainboard   
+
#                                                  -Repeat the process for each Mainboard   
-
                    Time: 1:00Am-6:00Pm  
+
*                    Time: 1:00Am-6:00Pm  
-
                    From 9:00Pm - 11:00Pm Working with Aaron on Testing BCCD ISOs for Skylar  
+
*                    From 9:00Pm - 11:00Pm Working with Aaron on Testing BCCD ISOs for Skylar  
''' Friday May 20/2011: BCCD Testing for skylar - Time Spent: Few hours '''
''' Friday May 20/2011: BCCD Testing for skylar - Time Spent: Few hours '''
''' Monday May 23/2011: Working on GalaxSee and other simulations - Time Spent: Few hours '''   
''' Monday May 23/2011: Working on GalaxSee and other simulations - Time Spent: Few hours '''   
-
                      * Learning about Their code  
+
*                      * Learning about Their code  
-
                      * Running GalaxSee and Life on LittleFe  
+
*                      * Running GalaxSee and Life on LittleFe  
''' Tuesday May 24/2011: BCCD test suite: --mailto option appears not to work - Time Spent: Few hours '''
''' Tuesday May 24/2011: BCCD test suite: --mailto option appears not to work - Time Spent: Few hours '''
-
                        * Worked on test suite  
+
*                        * Worked on test suite  
-
                        * Worked on Aaron on test suit and couldn't fix so emailed Sam about it
+
*                        * Worked on Aaron on test suit and couldn't fix so emailed Sam about it
-
                        * Keep reading for BW Workshops  
+
*                        * Keep reading for BW Workshops  
''' Wednesday May 25/2011: Learning about MPI and OpenMP for BW workshops - Time Spent: Few hours '''  
''' Wednesday May 25/2011: Learning about MPI and OpenMP for BW workshops - Time Spent: Few hours '''  
Line 65: Line 70:
''' Friday May 27/2011: Met with Aaron to do BCCD testing for Skylar - Time Spent: Just few hours '''
''' Friday May 27/2011: Met with Aaron to do BCCD testing for Skylar - Time Spent: Just few hours '''
-
---
+
-------------------------------------------------------------------------------
 +
==. Saturday May 28/2011 - June 10/2011: BW Internship Workshops ==
-
== Saturday May 28/2011 - June 10/2011: BW Internship Workshops ==
+
==. June Week 3: Back on Campus ==  
-
 
+
-
 
+
-
== June Week 3: Back on Campus ==  
+
''' Monday June 13/2011: Mainboard + Memory Testing - Time Spent: 6 Hours '''
''' Monday June 13/2011: Mainboard + Memory Testing - Time Spent: 6 Hours '''
-
                    Quantity: 30
+
*                    Quantity: 30
-
                    Tests: Positive
+
*                    Tests: Positive
-
                    Problem/Issues: None
+
*                    Problem/Issues: None
-
                    Time: 9:00Am-4:00Pm  
+
*                    Time: 9:00Am-4:00Pm  
   
   
''' Tuesday June 14/2011: Mainboard + Memory Testing - Time Spent: 4 Hours '''
''' Tuesday June 14/2011: Mainboard + Memory Testing - Time Spent: 4 Hours '''
-
                    Quantity: 18
+
*                    Quantity: 18
-
                    Tests: Positive
+
*                    Tests: Positive
-
                    Problem/Issues: None
+
*                    Problem/Issues: None
-
                    Time: 1:00Am-4:00Pm
+
*                    Time: 1:00Am-4:00Pm
''' Wednesday June 15/2011: Mainboard + Memory Testing + Bios Flashing - Time Spent: 6 Hours '''
''' Wednesday June 15/2011: Mainboard + Memory Testing + Bios Flashing - Time Spent: 6 Hours '''
-
                    Quantity: 15
+
*                    Quantity: 15
-
                    Tests: Positive
+
*                    Tests: Positive
-
                    Problem/Issues: None
+
*                    Problem/Issues: None
-
                    Time: 10:00Am-4:00Pm  
+
*                    Time: 10:00Am-4:00Pm  
''' Thursday June 16/2011: Bios Flashing + Changing Bios settings for LittleFes - Time Spent: 8 Hours '''
''' Thursday June 16/2011: Bios Flashing + Changing Bios settings for LittleFes - Time Spent: 8 Hours '''
-
                    Quantity: 60
+
*                    Quantity: 60
-
                    Tests: Positive
+
*                    Tests: Positive
-
                    Problem/Issues: None
+
*                    Problem/Issues: None
-
                    Time: 10:00Am-6:00Pm  
+
*                    Time: 10:00Am-6:00Pm  
''' Friday June 17/2011: Bios Flashing and Changing Bios settings for LiitleFes - Time Spent: 8 Hours  
''' Friday June 17/2011: Bios Flashing and Changing Bios settings for LiitleFes - Time Spent: 8 Hours  
-
                    Quantity: 60
+
*                    Quantity: 60
-
                    Tests: Positive, except one mainboard  
+
*                    Tests: Positive, except one mainboard  
-
                    Problem/Issues: During Bios Flashing lost electricity and damaged one mainboard  
+
*                    Problem/Issues: During Bios Flashing lost electricity and damaged one mainboard  
-
                                    * Instruction for repairing the damage can be found on littleFe.net/wiki
+
*                              * Instruction for repairing the damage can be found on littleFe.net/wiki
-
 
+
*                    Time: 10:00Am-6:00Pm  
-
                    Time: 10:00Am-6:00Pm  
+
''' Saturday June 18/2011: NOYES Lab clean up - Time Spent: few hours '''  
''' Saturday June 18/2011: NOYES Lab clean up - Time Spent: few hours '''  
-
                          * Organized Boxes  
+
*                          * Organized Boxes  
-
                          * Did some clean up around  
+
*                          * Did some clean up around  
-
                          * Reviewed BW Workshop materials  
+
*                          * Reviewed BW Workshop materials  
''' Sunday June 19/2011: Worked on N-Body Exercise + Meeting Charlie - Time Spent: few hour '''
''' Sunday June 19/2011: Worked on N-Body Exercise + Meeting Charlie - Time Spent: few hour '''
-
                        * Run the Nbody one cuda as well as MPI.  
+
*                        * Run the Nbody one cuda as well as MPI.  
-
                        * Did some reading about MPI  
+
*                        * Did some reading about MPI
-
== June Week 4: On Campus ==  
+
 
 +
 
 +
--------------------------------------------------
 +
===. June Week 4: On Campus ===
 +
--------------------------------------------------
''' Monday June 20/2011: Setting up 2 V3 LittleFes for coming conference - Time Spent: 8 hours '''
''' Monday June 20/2011: Setting up 2 V3 LittleFes for coming conference - Time Spent: 8 hours '''
-
                        * Flashed Bios on new mainboards for V3  
+
*                        * Flashed Bios on new mainboards for V3  
-
                        * Download BCCD 3.0.3 32-bit for LittleFes  
+
*                        * Download BCCD 3.0.3 32-bit for LittleFes  
-
                        * Liberate both V3  
+
*                        * Liberate both V3  
-
                        * Setup Network on both V3  
+
*                        * Setup Network on both V3  
-
                        * Worked on GalaxSee
+
*                        * Worked on GalaxSee
   
   
''' Tuesday June 21/2011: Updating BCCD Wiki - Time Spent: 8 hours '''
''' Tuesday June 21/2011: Updating BCCD Wiki - Time Spent: 8 hours '''
-
                        * Worked more on GalaxSee
+
*                        * Worked more on GalaxSee
-
                        * Updated BCCD wiki instruction for Running our examples on Live-CD/USB, or BCCD-Liberated  
+
*                        * Updated BCCD wiki instruction for Running our examples on Live-CD/USB, or BCCD-Liberated  
-
                        * Help around Ivan and Charlie  
+
*                        * Help around Ivan and Charlie  
-
                        * Downloaded Google Sketchup  
+
*                        * Downloaded Google Sketchup  
-
                        * Learned more on how to use Google Sketchup  
+
*                        * Learned more on how to use Google Sketchup  
''' Wednesday June 22/2011: Worked on Mainboards + GalaxSee - Time Spent: 8 hours '''
''' Wednesday June 22/2011: Worked on Mainboards + GalaxSee - Time Spent: 8 hours '''
-
                          * Repaired the damaged mainboard  
+
*                          * Repaired the damaged mainboard  
-
                          * Worked on Fixing GalaxSee on Liberated BCCD  
+
*                          * Worked on Fixing GalaxSee on Liberated BCCD  
-
                          * Helped around
+
*                          * Helped around
-
                          * More practice with Google Sketchup  
+
*                          * More practice with Google Sketchup  
''' Thursday June 23/2011: ISOs MicroFe + LittleFe - Time Spent: 8 hours '''
''' Thursday June 23/2011: ISOs MicroFe + LittleFe - Time Spent: 8 hours '''
-
                          * Downloaded and liberated Debian & BCCD for MicroFe  
+
*                          * Downloaded and liberated Debian & BCCD for MicroFe  
-
                          * Updated Wiki
+
*                          * Updated Wiki
-
                          * worked on one problematic node for V3
+
*                          * worked on one problematic node for V3
-
                          * Worked on GalaxSee  
+
*                          * Worked on GalaxSee  
-
                          * Learned more about MPI
+
*                          * Learned more about MPI
-
                          * watched some more Tutorials for Google Sketchup  
+
*                          * watched some more Tutorials for Google Sketchup  
''' Friday June 24/2011: Workshops preparation - Time spent 8 hours  '''
''' Friday June 24/2011: Workshops preparation - Time spent 8 hours  '''
-
  * Preparing and packing LittleFes for the upcoming workshops
+
* Preparing and packing LittleFes for the upcoming workshops
-
        * V3-Cuda for Aaron  
+
*        * V3-Cuda for Aaron  
-
        * V4 for Charlie and Ivan
+
*        * V4 for Charlie and Ivan
-
  * Working on Galaxsee on both liberated and live.
+
* Working on Galaxsee on both liberated and live
''' Saturday June 25/2011:  '''
''' Saturday June 25/2011:  '''
-
''' Sunday June 26/2011:  '''  
+
''' Sunday June 26/2011:  '''
-
== June 27/2011 - July 3/2011: On Campus  ==  
+
--------------------------------------------------------
 +
===. June 27/2011 - July 3/2011: On Campus  ===
 +
--------------------------------------------------------
''' Monday June 27/2011: Working on Wiring Harnesses - Time Spent about 6 hours '''
''' Monday June 27/2011: Working on Wiring Harnesses - Time Spent about 6 hours '''
-
  * Made few harnesses  
+
* Made few harnesses  
-
  * Worked on LittleFe  
+
* Worked on LittleFe  
-
  * Worked GalaxSee  
+
* Worked GalaxSee  
-
  * fixed the tools shelve  
+
* fixed the tools shelve  
 +
 
'''Tuesday Jun 28/2011: Time Spent: about 8 hours '''
'''Tuesday Jun 28/2011: Time Spent: about 8 hours '''
-
          * Working on soldering wiring harnesses for the littlefe project  
+
* Working on soldering wiring harnesses for the littlefe project  
-
          * Working on BCCD
+
* Working on BCCD
              
              
''' Wednesday June 29/2011: Time Spent: about 8 hours '''
''' Wednesday June 29/2011: Time Spent: about 8 hours '''
-
          * Working on soldering wire harnesses for LittleFe Project  
+
* Working on soldering wire harnesses for LittleFe Project  
-
          * Working on BCCD Video and Sound packages  
+
* Working on BCCD Video and Sound packages  
-
          * Working on GalaxSee and Life  
+
* Working on GalaxSee and Life  
''' Thursday June 30/2011: Time Spent 8 hours '''
''' Thursday June 30/2011: Time Spent 8 hours '''
-
          * Searching for Network Cables online  
+
* Searching for Network Cables online  
-
          * Searching for SATA cables online
+
* Searching for SATA cables online
-
          * Working on BCCD Sound
+
* Working on BCCD Sound
-
          * Working on GalaxSee and N-Body  
+
* Working on GalaxSee and N-Body
-
===='' July 1/2011 - July 3/2011: on Campus ''====
+
--------------------------------------------------------------------
 +
==. July 1/2011 - July 3/2011: on Campus ==
 +
 
 +
'''Friday July 1/2011: Time spent 8 hours '''
 +
 
 +
* Cleaning bit the NOYES Lab
 +
* Searching for right and cheapest Network and Sata cables
 +
* Working more about BCCD
-
'''Friday July 1/2011: Time spent 8 hours '''
 
-
          * Cleaning bit the NOYES Lab
 
-
          * Searching for right and cheapest Network and Sata cables
 
-
          * Working more about BCCD
 
''' Satuday July 2/2011: '''
''' Satuday July 2/2011: '''
-
''' Sunday July 3/2011:
 
 +
''' Sunday July 3/2011: '''
 +
------------------------------------------------------------------
 +
===. July 4/2011 - July 10/2011 -- On Campus ===
 +
----------------------------------------------------------------
 +
 +
''' Monday July 4/2011: Testing New ISOs for V3 & V4 -- Time Spent: 8 hours '''
 +
* Made New Cuda + Bluetooth capable Bootable USB BCCD ISO for V3 and V4
 +
* Liberating new ISOs
 +
* Testing GalaxSee
 +
* Checking errors for Running GalaxSee
 +
 +
''' Tuesday July 5/2011: Testing New ISOs for V3 & V4 -- Time Spent: 8 hours '''
 +
* Testing GalaxSee Under both 32-bit and 64-bit New ISO.
 +
* Liberating New ISOs
 +
* Debugging the bccd-snarfhost/bccd-Alloall problem
 +
 +
''' Wednesday July 6/2011: Debugging GalaxSee on V3s -- Time Spent: All day '''
 +
* Bash script for Running GalaxSee on 32/64-bit
 +
* Made 3.0.3V stable Bootable USB BCCD ISO for V3 and V4
 +
* Liberating latest Stable Version ISOs on all the machines
 +
 +
''' Thursday July 7/2011: Debugging GalaxSee  -- Time Spent: All day  '''
 +
* Searching online market for right Sata Cables
 +
* Searching online market for right Network jumpers
 +
* Searching online for wireless antennas
 +
* Debugging GalaxSee under OpenMPI and MPICH2
 +
 +
''' Friday July 8/2011: Debugging GalaxSee on V3s with Stable ISO -- Time Spent: All day  '''
 +
* Running and Debugging galaxSee under OpenMPI and MPICH2.
 +
* Debugging bccd-allowall problem/bccd-snarfhosts
 +
* Helping with Hardware problems
 +
 +
''' Saturday July 9/2011: Liberating and Testing New ISO -- Time Spent: 1-6:00Pm  '''
 +
* Downloaded ISO with Cuda + Bluethoot + no bccd-allowall
 +
* Liberated and tested on all the machines
 +
* Fixing PXE-Booting problem with New ISO
 +
* Learning about LM-Sensors
 +
 +
''' Sunday July 10/2011: Cooking + Packing for workshop -- Time Spent: All day  '''
 +
* Cooked lunch for team
 +
* worked on GalaxSee Problem
 +
* Did reading for tomorrow workshop
 +
* Liberated New ISO on V3
 +
* Packing for workshop
 +
* Reading about CUDA for UO
 +
 +
-----------------------------------------------------------------------------------------
 +
===. July 11/2011 - July 20/2011 ===
 +
-----------------------------------------------------------------------------------------
 +
 +
''' Monday July 11/2011: IUPUI Workshop -- Time Spent: All day  '''
 +
* IUPUI Workshop
 +
* Unpacking V3 + V4 after workshops
 +
 +
 +
''' Tuesday July 12/2011: Learning about CVS -- Time Spent: 8 hours  '''
 +
* Learning about CVS
 +
* Working with debugging the tests directory files
 +
* working on test mailto option
 +
 +
''' Wednesday July 13/2011: CVS + Harnesses -- Time Spent: 8 hours  '''
 +
* Working on CVS
 +
* GalaxSee
 +
* Soldering wire Harnesses
 +
* working with V4
 +
 +
''' Thursday July 14/2011: Soldering Wire Harnesses  -- Time Spent: 8 hours  '''
 +
* Soldering wire harnesses for V4
 +
* Soldering wires for MicroFe
 +
* Working on TeraGrid Poster
 +
* Running GalaxSee for TeraGrade Poster
 +
 +
''' Friday July 15/2011: Soldering Wire Harnesses + ISOs  -- Time Spent: All day  '''
 +
* Made 12 More wire harnesses for V4 buildout
 +
* Download + Liberated + Tested the new ISO
 +
* worked on Galaxsee for Poster
 +
 +
''' Saturday July 16/2011: Soldering Wire Harnesses  -- Time Spent: 8 hours  '''
 +
* Finished with all 28 Wire harnesses for V4 Buildout
 +
* Worked on tests directory files
 +
* Cuda exercises for OU
 +
* MPI
 +
 +
''' Sunday July 17/2011: Free  '''
 +
 +
''' Monday July 18/2011: Shrinking tubes -- Time Spent: 9:00am - 5:00pm, 8:00pm - 12:30pm'''
 +
* Putting Shrinking tubes on wire harnesses for the build out
 +
* Testing New ISOs for Skylar
 +
* Liberated new noba iso on all the LittleFe machines
 +
 +
''' Tuesday July 19/2011: Test Suite -- Time Spent: 10:00am - 7:00pm '''
 +
* Working on Test Suite on new noba ISO
 +
* Running Galaxsee on both new noba 32-bit and 64-bit
 +
* copied Test suite from Trank to test
 +
 +
-----------------------------------------------------------------------------------------
 +
 +
===. July 20/2011 - July 30/2011 ===
 +
-----------------------------------------------------------------------------------------
 +
 +
''' Wednesday July 20/2011:  -- Time Spent: 8 hours  '''
 +
* Working on Noba ISO
 +
* BCCD conference call
 +
* Noba still had the problem. after mentioning it on bccd conference call Skylar made a new one
 +
* Testing another Latest Noba ISO on LittleFes'
 +
 +
''' Thursday July 21/2011: -- Time Spent: 8 hours '''
 +
* Shrinking tubes on harnesses
 +
* Test Suite on Latest Noba ISO
 +
* Running GalaxSee on Latest Noba ISO
 +
 +
''' Friday July 22/2011: -- Time Spent: 10:00am - 7:00pm '''
 +
* Helping with Inventory and LittleFe kits for the Build out
 +
* Liberating new ISO on LittleFes
 +
* Reading Preparations for the Workshops
 +
 +
 +
''' Saturday July 23/2011: --Time Spent: 11:30am - 8:00mp '''
 +
* Preparing the Frames and LittleFe kits for the build out
 +
* Reading and exercises for the workshops
 +
* Running Test Suite
 +
 +
''' Sunday July 24/2011:Washing V4 frames -- Time Spent: 10:00am-1:30Am  ''' 
 +
*Washed all Aluminum parts for the V4 OK+PURP build out.
 +
*Helped Ivan with some stuff
 +
*Prototype 
 +
 +
''' Monday July 25/2011:Help with Shipping -- Time Spent: 8 hours  '''
 +
*Packing kits for OK and PURP
 +
*working prototypes
 +
*Reading on Branching
 +
 +
''' Tuesday July 26/2011: Test Suite -- Time Spent: 9:00am-5:00pm, 11:00pm-3:00am  '''
 +
*Fixing Test suite issue
 +
*I download Test Suite directory from Trunk/Charliep
 +
*put it on both 32-bit and 64-bit
 +
*Resolved the issue of Syncdir
 +
 +
 +
''' Wednesday July 27/2011: Prototype + Test Suite -- Time Spent: 10:am - 9:00pm '''
 +
* Washed V4 prototypes
 +
* Working on Test Suite
 +
* Learning how to write Test suite for the Cuda 
 +
 +
''' Thursday July 28/2011:  '''
 +
* Assembled prototypes
 +
* Made the V4 ready for Aaron to take it to PUPR
 +
* Liberated the working noba on all the prototypes for the build out
 +
 +
 +
''' Friday July 29/2011:  '''
 +
* Left for OU workshops
 +
         
 +
''' Saturday July 30/2011:  '''
 +
* @OU writing test suites for Cuda, Area under the curve
 +
 +
''' Sunday July 31/2011: First LittleFe Build out at OU '''
 +
 +
-------------------------------------------------------------------------------------------
 +
 +
==. August 1/2011 - August 6/2011: Intermediate Parallel Workshops ==
 +
 +
===. August 7/2011 - August 15/2011: ===
 +
-----------------------------------------------------------------------------------------
 +
''' Sunday August 7/2011: Free '''
 +
 +
''' Monday August 8/2011: CVS/blue-waters -- Time Spent: 8 hours '''
 +
* Setting prototypes
 +
* Setting up Network
 +
* Start Reading the CVS/GalaxSee
 +
 +
''' Tuesday August 9/2011: CVS/blue-waters -- Time Spent: 8 hours '''
 +
* checking out CVS/blue-waters
 +
* Working on GalaxSee
 +
* Reading the Manual for Running new GalaxSee on al-salam and LittleFe
 +
 +
''' Wednesday August 10/2011: CVS/blue-waters -- Time Spent: 8 hours '''
 +
* Working on GalaxSeeHPC
 +
* Downloading appropriate libraries for GalaxSeeHPC
 +
* Update Matrix Matrix Multiplication Makefile to work on BCCD
 +
* Added a test script for mm-multiply
 +
* Read most of the mm-multiply code to write multiple different test scripts
 +
 +
''' Thursday August 11/2011: CVS/blue-waters -- Time Spent: 8 hours '''
 +
* Working on GalaxSeeHPC Makefile to work on BCCD
 +
* Updating CUDA Makefile to work on BCCD
 +
* added a test script for CUDA in tests directory
 +
* Read Most of the CUDA Code to write multiple different test scripts
 +
*
 +
 +
''' Friday August 12/2011: CVS/blue-waters -- Time Spent: 8 hours '''
 +
* Working on Galaxsee2
 +
* Working on Matrix Matrix Multiplication
 +
* Update CVS
 +
 +
''' Saturday August 13/2011: CVS/blue-waters -- Time Spent: 8 hours '''
 +
* Fimilarizing my self with the CUDA code
 +
* Read the Cuda programming manual
 +
*
 +
 +
''' Sunday August 14/2011: Free -- Time Spent: 8 hours '''
 +
* Free
 +
 +
''' Monday August 15/2011: CVS/blue-waters -- Time Spent: 8 hours '''
 +
* Work on apply keyboard with two LittleFes
 +
* Worked on mm-multiply trying to figure out why screen flashes once you run the program
 +
* CVS update
 +
 +
''' Tuesday August 16/2011: CVS/blue-waters -- Time Spent: 8 hours '''
 +
* mm-multiply code debugging
 +
*
 +
 +
------------------------------------------------------------------------------
 +
===. August 17/2011 - August 24/2011: Free ===
 +
------------------------------------------------------------------------------
 +
 +
===. August 25/2011 - August 31/2011:  ===
 +
------------------------------------------------------------------------------
 +
''' Thursday August 25/2011: CVS/blue-waters -- Time Spent: 8 hours '''
 +
*
 +
''' Friday August 26/2011: CVS/blue-waters -- Time Spent: 8 hours '''
 +
*
 +
''' Saturday August 27/2011: NOYES LAB -- Time Spent: 8 hours '''
 +
* Cleaning around NOYES Lab
 +
* BCCD Buildout Session
-
                         
+
''' Sunday August 28/2011:  -- Time Spent: 8 hours '''
 +
*
 +
''' Monday August 29/2011:  -- Time Spent: 8 hours '''
 +
*
 +
''' Tuesday August 30/2011: CVS/blue-waters -- Time Spent: 8 hours '''
 +
*
 +
''' Wednesday August 31/2011: CVS/blue-waters -- Time Spent: 8 hours '''
 +
*
 +
           
* etc.
* etc.

Latest revision as of 19:28, 27 August 2011

* Day, activity, time


Contents

. May 12/2011 - May 29/2011

Monday May 16/2011: Mainboard + Memory Testing - Time Spent: 6 Hours

  • Quantity: 40
  • Tests Results: Positive
  • Problem/Issues: None
  • Time: 1:00Am - 6:00Pm

Tuesday May 17/2011: Mainboard + Memory Testing - Time Spent: 6 Hours

  • Quantity: 40
  • Tests Results: Positive
  • Problem/Issues: None
  • Time: 1:00Am - 6:00Pm

Wednesday May 18/2011: Mainboard + Memory Testing + LittleFe - Time Spent: 6 Hours

Thursday May 19/2011: LittleFe + BCCD Testing - Time Spent: 6 Hours

  1. -Restart Mainboard
  2. -Press DEL - TO enter setup
  3. -Go to Integrated Peripherals
  4. -Go to Onboard Device Function
  5. -Change the LAN BootROM to Enabled
  6. -Press F10 to save and exit BIOS
  7. -Repeat the process for each Mainboard

Friday May 20/2011: BCCD Testing for skylar - Time Spent: Few hours

Monday May 23/2011: Working on GalaxSee and other simulations - Time Spent: Few hours

Tuesday May 24/2011: BCCD test suite: --mailto option appears not to work - Time Spent: Few hours

Wednesday May 25/2011: Learning about MPI and OpenMP for BW workshops - Time Spent: Few hours

Thursday May 26/2011: Preparations for BW workshops - Time Spent: Just Few hours

Friday May 27/2011: Met with Aaron to do BCCD testing for Skylar - Time Spent: Just few hours


. Saturday May 28/2011 - June 10/2011: BW Internship Workshops

. June Week 3: Back on Campus

Monday June 13/2011: Mainboard + Memory Testing - Time Spent: 6 Hours

Tuesday June 14/2011: Mainboard + Memory Testing - Time Spent: 4 Hours

Wednesday June 15/2011: Mainboard + Memory Testing + Bios Flashing - Time Spent: 6 Hours

Thursday June 16/2011: Bios Flashing + Changing Bios settings for LittleFes - Time Spent: 8 Hours

Friday June 17/2011: Bios Flashing and Changing Bios settings for LiitleFes - Time Spent: 8 Hours

Saturday June 18/2011: NOYES Lab clean up - Time Spent: few hours

Sunday June 19/2011: Worked on N-Body Exercise + Meeting Charlie - Time Spent: few hour



. June Week 4: On Campus


Monday June 20/2011: Setting up 2 V3 LittleFes for coming conference - Time Spent: 8 hours

Tuesday June 21/2011: Updating BCCD Wiki - Time Spent: 8 hours

Wednesday June 22/2011: Worked on Mainboards + GalaxSee - Time Spent: 8 hours

Thursday June 23/2011: ISOs MicroFe + LittleFe - Time Spent: 8 hours

Friday June 24/2011: Workshops preparation - Time spent 8 hours

Saturday June 25/2011:

Sunday June 26/2011:


. June 27/2011 - July 3/2011: On Campus


Monday June 27/2011: Working on Wiring Harnesses - Time Spent about 6 hours

Tuesday Jun 28/2011: Time Spent: about 8 hours

Wednesday June 29/2011: Time Spent: about 8 hours

Thursday June 30/2011: Time Spent 8 hours


. July 1/2011 - July 3/2011: on Campus

Friday July 1/2011: Time spent 8 hours

Satuday July 2/2011:

Sunday July 3/2011:


. July 4/2011 - July 10/2011 -- On Campus


Monday July 4/2011: Testing New ISOs for V3 & V4 -- Time Spent: 8 hours

Tuesday July 5/2011: Testing New ISOs for V3 & V4 -- Time Spent: 8 hours

Wednesday July 6/2011: Debugging GalaxSee on V3s -- Time Spent: All day

Thursday July 7/2011: Debugging GalaxSee -- Time Spent: All day

Friday July 8/2011: Debugging GalaxSee on V3s with Stable ISO -- Time Spent: All day

Saturday July 9/2011: Liberating and Testing New ISO -- Time Spent: 1-6:00Pm

Sunday July 10/2011: Cooking + Packing for workshop -- Time Spent: All day


. July 11/2011 - July 20/2011


Monday July 11/2011: IUPUI Workshop -- Time Spent: All day


Tuesday July 12/2011: Learning about CVS -- Time Spent: 8 hours

Wednesday July 13/2011: CVS + Harnesses -- Time Spent: 8 hours

Thursday July 14/2011: Soldering Wire Harnesses -- Time Spent: 8 hours

Friday July 15/2011: Soldering Wire Harnesses + ISOs -- Time Spent: All day

Saturday July 16/2011: Soldering Wire Harnesses -- Time Spent: 8 hours

Sunday July 17/2011: Free

Monday July 18/2011: Shrinking tubes -- Time Spent: 9:00am - 5:00pm, 8:00pm - 12:30pm

Tuesday July 19/2011: Test Suite -- Time Spent: 10:00am - 7:00pm


. July 20/2011 - July 30/2011


Wednesday July 20/2011: -- Time Spent: 8 hours

Thursday July 21/2011: -- Time Spent: 8 hours

Friday July 22/2011: -- Time Spent: 10:00am - 7:00pm


Saturday July 23/2011: --Time Spent: 11:30am - 8:00mp

Sunday July 24/2011:Washing V4 frames -- Time Spent: 10:00am-1:30Am

Monday July 25/2011:Help with Shipping -- Time Spent: 8 hours

Tuesday July 26/2011: Test Suite -- Time Spent: 9:00am-5:00pm, 11:00pm-3:00am


Wednesday July 27/2011: Prototype + Test Suite -- Time Spent: 10:am - 9:00pm

Thursday July 28/2011:


Friday July 29/2011:

Saturday July 30/2011:

Sunday July 31/2011: First LittleFe Build out at OU


. August 1/2011 - August 6/2011: Intermediate Parallel Workshops

. August 7/2011 - August 15/2011:


Sunday August 7/2011: Free

Monday August 8/2011: CVS/blue-waters -- Time Spent: 8 hours

Tuesday August 9/2011: CVS/blue-waters -- Time Spent: 8 hours

Wednesday August 10/2011: CVS/blue-waters -- Time Spent: 8 hours

Thursday August 11/2011: CVS/blue-waters -- Time Spent: 8 hours

Friday August 12/2011: CVS/blue-waters -- Time Spent: 8 hours

Saturday August 13/2011: CVS/blue-waters -- Time Spent: 8 hours

Sunday August 14/2011: Free -- Time Spent: 8 hours

Monday August 15/2011: CVS/blue-waters -- Time Spent: 8 hours

Tuesday August 16/2011: CVS/blue-waters -- Time Spent: 8 hours


. August 17/2011 - August 24/2011: Free


. August 25/2011 - August 31/2011:


Thursday August 25/2011: CVS/blue-waters -- Time Spent: 8 hours

Friday August 26/2011: CVS/blue-waters -- Time Spent: 8 hours

Saturday August 27/2011: NOYES LAB -- Time Spent: 8 hours

Sunday August 28/2011: -- Time Spent: 8 hours

Monday August 29/2011: -- Time Spent: 8 hours

Tuesday August 30/2011: CVS/blue-waters -- Time Spent: 8 hours

Wednesday August 31/2011: CVS/blue-waters -- Time Spent: 8 hours

Personal tools
Namespaces
Variants
Actions
websites
wiki
this semester
Toolbox